Solar Panel Removal for Reroofing in California
Published by FreeSolarPanelsCA · Last updated
Roof work with solar needs a plan for both the roof and the electrical system. Ask who will remove the panels, protect the equipment and put the system back into service.
Check ownership and service terms
For a leased system or PPA, contact the equipment owner before arranging removal. Read the contract for authorized service, costs and warranty conditions. If you own the system, ask the installer and equipment maker what documentation they require. Source.
Do not treat the roof quote as a solar removal quote unless it clearly includes that work. Get the scope and responsibilities in writing. Source.
Check the license scope for solar and roof work
CSLB?s C-46 classification covers installing, modifying, maintaining and repairing solar energy systems. Its description limits other building trades to work required for the solar installation. A C-46 classification alone is not a blanket authorization for a separate whole-roof replacement. Source.
Before signing a combined reroofing and solar contract, ask which licensed contractor will perform each scope. Check the license classifications with CSLB rather than assuming the crew removing panels is also qualified for every roofing task. Source.
Request an itemized project scope
Ask the bids to separate removal, storage, roof work, reinstallation, damaged equipment, electrical work and any permit changes. Record who is responsible for leaks and who tests the reinstalled system. Source.
No statewide removal price is quoted here. Panel count alone cannot establish the cost. Roof access, equipment condition, contract terms and the approved design all need review. Source.
Confirm the return-to-service path
Ask the city or county permit office whether the roof work or system changes need approval. Ask the utility whether changing equipment affects the connection agreement or tariff. Keep both answers with the work order. Source.
After the job, retain the inspection record, service report and updated drawings. Compare system performance with its documented operating condition before removal. Source.